chore: record journal
This commit is contained in:
@@ -446,3 +446,24 @@ Added vendored lane-icons assets, tested OSM turn-lane arrow generation and lane
|
||||
### Status
|
||||
|
||||
[OK] **Completed**
|
||||
|
||||
|
||||
## Session 22: Cesium semantic inspection preview
|
||||
|
||||
**Date**: 2026-08-05
|
||||
**Task**: Cesium semantic inspection preview
|
||||
**Branch**: `main`
|
||||
|
||||
### Summary
|
||||
|
||||
Added semantic Cesium inspection assets and controls; fixed compressed metadata to preserve inspection assets; verified the rebuilt compressed preview.
|
||||
|
||||
### Git Commits
|
||||
|
||||
| Hash | Message |
|
||||
|------|---------|
|
||||
| `607d8fc` | (see git log) |
|
||||
|
||||
### Status
|
||||
|
||||
[OK] **Completed**
|
||||
|
||||
Reference in New Issue
Block a user