# Design Each approach contributes its two carriageway-edge points at the common cutback distance. Points are ordered around the junction node. For each pair from adjacent approaches, the compiler samples a deterministic quadratic Bezier whose control point follows the pedestrian-side curb arc toward the junction. Rounded plans use a larger cutback than the legacy straight envelope so this visible curb shape still contains all turning connectors. Approach road surfaces terminate at the same cutback, so they cannot cover the junction outline in 3D output. The curve is accepted only when the support intersection is finite, the pair belongs to different approaches, and the resulting ring remains valid and contains all published connector coordinates. Otherwise the original straight chord remains for that corner and the plan reports a mixed/fallback boundary. Lane connectors remain a separate vehicle-path layer. This task changes only the road/intersection outline and sidewalk-corner shape.